The building site: A steep, limestone hillside with little topsoil.
Date: 07/02/2007
Views: 320
|
We start by clearing off the organic material and cleaning the exposed bedrock with a pressure washer.
Date: 07/02/2007
Views: 314
|
The stem wall was built directly on top of the limestone bedrock (no rubble trench!).
Date: 07/02/2007
Views: 349
|
|
Lise attempts to cut grass for the cob with a chop saw (not very successful, but fun to watch!).
Date: 07/02/2007
Views: 323
|
Tony makes some cobs.
Date: 07/02/2007
Views: 354
|
Asha (also known as Whiteman) shows off his perfectly formed cob.
Date: 07/02/2007
Views: 333
|
|
Saia got a "likkle dirty..."
Date: 07/02/2007
Views: 344
|
Patrick checks the wall for plumb.
Date: 07/02/2007
Views: 350
|
Building an arched doorway.
Date: 07/02/2007
Views: 365
|
|
The walls are half-way up.
Date: 07/02/2007
Views: 401
|
Particpants make cobs for the cottage.
Date: 07/02/2007
Views: 373
|
Saia works on plastering the cob walls.
Date: 07/02/2007
Views: 369
|
|
Bottles in the wall make add a beautiful artistic feature to the building.
Date: 07/02/2007
Views: 452
|
An "Om" sculpted onto the wall.
Date: 07/02/2007
Views: 389
|
Side view, walls up.
Date: 07/02/2007
Views: 504
|
|
Inside the "living room."
Date: 07/02/2007
Views: 509
|
Bottom view, walls up.
Date: 07/02/2007
Views: 544
|
|